Illumina Innovates with Rancher and Kubernetes
When you create a resource quota, you are configuring the pool of resources available to the project. You can set the following resource limits for the following resource types.
.status.phase in (Failed, Succeeded)
* When setting resource quotas, if you set anything related to CPU or Memory (i.e. limits or reservations) on a project / namespace, all containers will require a respective CPU or Memory field set during creation. As of v2.2.0, a container default resource limit can be set at the same time to avoid the need to explicitly set these limits for every workload. See the Kubernetes documentation for more details on why this is required.